An 80-person corporate office in Gulberg, Lahore needed a reliable drinking water solution to replace their aging water cooler dispensers, which required constant bottle refills and had become a recurring cost.
After a site survey, we proposed and installed a commercial-grade RO plant with a 200 GPD output capacity, connected directly to dispensing points on two floors. The system includes a booster pump for consistent pressure and a UV sterilization stage for added safety in a high-traffic office environment.
The office has been on our Commercial AMC plan since installation, with quarterly maintenance visits keeping the system running at full capacity without any reported downtime.